| 管棚成孔失水引起地表沉降因素分析(27 卷) |
| 英文标题 |
| Analysis of Ground Surface Settlement Induced by Water Lossin the Drilling Phase of Pipe Roof Construction |
| 摘要 |
| 利用Biot固结理论,对管棚成孔和推进过程中因渗水而引起的沉降进行计算分析,研究管棚施工时间、管棚数量、不同的管棚直径和地层不同的渗透系数对地表沉降的影响。分析结果表明,若管棚施工从钻孔到注浆的时间控制在2 h以内,则地表最大沉降量小于5 mm;若该时间为8 h,则对 |