| 标题 |
| 奎北铁路特大桥架梁及超长距离铺轨施工工艺(50 卷) |
| 英文标题 |
| Construction procedure on erection of super-large bridge girder and laying of super-long track for Kuitun-Beitun railway |
| 摘要 |
| 奎北铁路铺架施工中受百里风区及无人区影响较大,实际作业天数不足350 d。介绍特大桥的架梁、超长距离连续性快速铺轨以及铺轨架梁交叉施工工艺的改进措施,通过铺架施工工艺的改进,使铺架速度大大提高,保证了奎北铁路的施工工期。 |
| 作者 |
| 新闻作者:乔建民 |
| 关键字 |