
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|

| 标题 |
| 京沪高速铁路李窑试验段CFG桩复合地基试验研究(49 卷) |
| 英文标题 |
| Experimental study on CFG pile composite foundation at Liyao test section in Beijing-Shanghai high speed railway |
| 摘要 |
| 京沪高速铁路李窑试验段是“高速铁路CFG桩复合地基综合技术研究”选定的深厚压缩层地基条件典型工点。重点介绍了试验段工程方案设计、沉降计算分析及与现场测试数据的比较分析情况,指出了工程方案优化方向,同时对于试验段进行的其它研究内容和成果进行了概要介绍。 |
| 作者 |
| 新闻作者:崔维孝 |
| 关键字 |