| 京包线大包段电气化改造工程施工与运输组织的协调(29 卷) |
| 英文标题 |
| Coordination Between Electrification Reconstruction Engineering and Transport Organization on Datong-Baotou Section of Jingbao Line |
| 摘要 |
| 根据京包线大同至包头段电气化改造工程的特点,结合呼和浩特铁路局历年的施工经验,就大包段电气化改造工程施工与运输组织协调问题进行了探讨。提出了施工组织为运输组织创造条件、运输组织为施工提供空间的措施和手段。 |